|
|
TM 9-2320-312-24-1
POWER TAKE-OFF (PTO) REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts
Cap set, protective (Item 6, WP 0165 00)
Direct Support
Cleaning compound, solvent, Type III (Item 10, WP
MAC Reference
Fluid, hydraulic, petroleum base (Item 25 or 26,
Group 180
RPSTL Reference
Rag, wiping (Item 51, WP 0165 00)
Bolt (P/N DIN933-M10X25-8.8-B3B) (10)
Group 070, Figure 16
Gasket (P/N 23048037)
Group 180, Figure 1
Equipment Condition
Tools and Special Tools
Cab tilted (TM 9-2320-312-10)
Tool kit, general mechanic's (Item 35, WP 0166 00)
Fifth wheel lift hydraulic pump removed (WP 0161
Shop equipment, field maintenance (Item 27, WP
Battery disconnect switch in OFF position
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |