TM 9-2320-312-24-1
PLACING CAB IN 90-DEGREE TILT POSITION - CONTINUED
0147 00
PLACING CAB IN 90-DEGREE TILT POSITION - CONTINUED
NOTE
Approximately 24 ft (7.3 m) of chain is needed to rig chain between bottom left lifting lug and rear of trac-
tor.
19.
Rig chain (34) to clevis at lifting lug (33). Rig other end of chain through two lift/tiedown lugs (35 and 36) at rear of
tractor. Pass chain to left of fifth wheel.
20.
Adjust slack in chain (34) so that there is approximately 17.3 ft (5.3 m) of chain between midpoint of lifting lug (33) at
rear of cab and midpoint of lift/tiedown lug (35) at rear of tractor. Secure chain.
32
34
35
36
33
0147 00-8
|