|
|
TM 9-2320-312-24-1
POWERPACK REPLACEMENT - CONTINUED
0138 00
INSTALLATION
1.
If installing a new transmission, perform the following steps:
a.
Remove all shipping plugs and PTO cover plate and transfer them to old transmission to seal old transmission
for storage or shipment.
b.
Install transmission rear support bracket (10) to transmission (20) with four bolts (37). Tighten bolts to 66-81
lb-ft (90-110 Nm).
10
37
20
c.
Install anchor bracket for wiring harness connector to right rear of transmission with bolt and nut.
d.
Install rear yoke (Group 070 Commercial Service Manuals).
e.
Install fifth wheel lift hydraulic pump (WP 0161 00).
f.
Install PTO and PTO hose to transmission (Group 070 Commercial Service Manuals).
g.
Install transmission sensors and sending units (Group 070 Commercial Service Manuals).
h.
Install transmission fill dipstick tube (WP 0027 00).
i.
Install transmission oil sampling valve hose fittings (WP 0132 00).
j.
Install transmission oil cooler fittings (WP 0029 00).
k.
Install all other hoses, lines, and fittings that must be transferred to new transmission.
l.
Remove torque converter shipping restraint bar from torque converter bell housing. Transfer restraint bar to
old transmission.
2.
If installing a new engine, perform the following steps:
a.
Remove all shipping plugs and transfer them to old engine to seal old engine for storage or shipment.
b.
Install engine mount bracket (22) to bell housing (34) of new engine with four new lockwashers (35) and bolts
(36). Tighten bolts to 315 lb-ft (427 Nm).
0138 00-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |