Click here to make tpub.com your Home Page

Page Title: CIRCUIT BREAKER REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-312-24-1
CAB TILT PUMP ASSEMBLY MAINTENANCE - CONTINUED
0124 00
CIRCUIT BREAKER REMOVAL
NOTE
Tag wires to ensure correct installation.
Remove tiedown straps as needed and discard. Use new tiedown straps on installation.
1.
Open pump box (2).
2.
Remove two screws (25), lockwashers (26), and locknuts (27) to separate circuit breaker (21) from side of pump box
(2). Discard locknuts and lockwashers.
NOTE
Replacement circuit breaker comes with new attaching hardware for wires.
3.
Remove two screws (22) and lockwashers (23) to disconnect wire (19) and wire (24) from rear of circuit breaker (21).
21
22,23
2
19
25,26,27
24
CIRCUIT BREAKER INSTALLATION
1.
Connect wire (19) and wire (24) to rear of circuit breaker (21) with two new lockwashers (23) and screws (22).
2.
Install circuit breaker (21) to side of pump box (2) with two screws (25), new lockwashers (26), and new locknuts (27).
3.
Close pump box (2).
4.
Place battery disconnect switch in ON position.
END OF WORK PACKAGE
0124 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business