|
|
TM 9-2320-312-24-1
INTERVEHICULAR AIR HOSE ASSEMBLY MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Disassembly, Assembly, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts
Unit
Compound, pipe sealing (Item 20, WP 0165 00)
MAC Reference
Detergent (Item 23, WP 0165 00)
Group 150
Packing, preformed (P/N 1509)
RPSTL Reference
Equipment Condition
Group 150, Figure 5
Wheels blocked
Tools and Special Tools
Air system drained (TM 9-2320-312-10)
Tool kit, general mechanic's (Item 35, WP 0166 00)
WARNING
DO NOT disconnect any air lines or fittings unless engine is shut down and air system pressure is relieved.
Failure to follow this warning could result in serious injury to personnel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |