| |
TM 9-2320-304-14&P
5-235
Direct Support and General Support Maintenance (Cont)
(43) Measure and mark seven new screw hole positions on right-side frame rail (2) and left-side
frame rail (4).
(44) Drill two 0.813-in. (20.7 mm) holes (64) on each rail near existing holes (65) as shown.
(45) Drill three 0.812-in. (20.6 mm) holes (66) near end of frame rails (2) and (4) as shown.
Change 1
|