| |
TM 9-2320-304-14&P
5-236
Direct Support and General Support Maintenance (Cont)
5-43. CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
WARNING
Rear roller bracket weighs 150 lbs. (68 kg). Attach suitable lifting device to prevent possible
injury to personnel.
(46) Attach lifting device to rear roller bracket (67).
(47) Soldier A position rear roller bracket (67) on right-side frame rail (2) and Soldier B secure with
five screws (68) and locknuts (69). Do not tighten screws.
(48) Position bottom two screws (70) and locknuts (71) at center split of right rear roller bracket (67)
and left rear roller bracket (72) to maintain alinement.
NOTE
Shims are 1/16 in. (1.59 mm) thick. Add one shim per every 1/16-in. (1.59 mm) gap.
(49) Measure gap at center split and determine number of shims (73) required.
(50) Position shim(s) (73), if required, in center split and install remaining four screws (70) and
locknuts (71).
(51) Soldier A and Soldier B position five screws (74) and locknuts (75) on rear roller bracket (72),
right-side frame rail (2), and rear crossmember (76).
NOTE
Perform step (52) for right side only.
(52) Install screw (77), two washers (78), and locknut (79) on rear roller bracket (67).
Change 1
|