| |
TM 9-2320-304-14&P
5-124
Direct Support and General Support Maintenance (Cont)
5-25. LOAD HANDLING SYSTEM (LHS) MAIN FRAME TUBE REPLACEMENT (CONT).
(5) Apply hydraulic oil to preformed
packing (11).
(6) Install tube nut (12), compression
ring (13), spacer (14), preformed
packing (11), and adapter (15) on
tube (2).
(7) Install four clamps (16), two cover
plates (17), washers (18),
lockwashers (19), and screws (20).
(8) Install hose 2891 (21), hose 2881 (22),
two clamps (16), cover plate (17),
lockwasher (18), and screw (20) on main
frame (3).
|