| |
TM 9-2320-304-14&P
5-123
Direct Support and General Support Maintenance (Cont)
b. Installation.
(1) Apply hydraulic oil to preformed packing (1).
(2) Position tube (2) through main frame (3) and install nut (4), compression ring (5), spacer (6),
and preformed packing (1) on tube (2).
NOTE
Install cable ties as required to secure harness to tube.
(3) Insert tube (2) into bulkhead (7) and install nut (4) on bulkhead.
(4) Install proximity switch (8) with clamps
using two screws (9) and
lockwashers (10).
|