| |
TM 9-2320-304-14&P
5-122
Direct Support and General Support Maintenance (Cont)
5-25. LOAD HANDLING SYSTEM (LHS) MAIN FRAME TUBE REPLACEMENT (CONT).
(14) Remove two screws (25),
lockwasher (26), and proximity
switch (27) with clamp. Do not
separate clamp halves.
NOTE
Remove cable ties from tube as required.
(15)Remove tube nut (28) from bulkhead (29) at inside rear of main frame (5).
(16)Pull tube (24) from bulkhead (29), remove preformed packing (30), spacer (31), compression
ring (32), and nut (28) from tube and remove tube from main frame (5). Discard preformed
packing.
|