Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LHS OVER LOAD
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-304-14&P 2-66 Operating Instructions (Cont) 2-9. LOAD HANDLING SYSTEM (LHS) (CONT). CAUTION · To avoid equipment damage, visually check that hook arm cylinders have completed full extension. · To avoid equipment damage, ensure that hook arm cylinders do not complete full extension while operating at engine speeds above idle. · Ensure rail transport locking pins are disengaged before unloading flatrack. Rail transport locking pins are used for rail transport only. Failure to comply may result in damage to equipment. NOTE · LHS OVER LOAD indicator will come on when hook arm cylinders are fully extended and joystick is activated. · The amount of time to load and unload is controlled by engine speed. Engine speed can be increased to 1,500 to maximum rpm to reduce loading and unloading times. (7)   Move the joystick (8) to UNLOAD position and hold until hook arm cylinders (9) are fully extended.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business