Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOAD HANDLING SYSTEM (LHS) (CONT)
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-304-14&P 2-56 Operating Instructions (Cont) 2-9. LOAD HANDLING SYSTEM (LHS) (CONT). WARNING · Check for overhead power lines or other obstructions before attempting LHS operation. LHS reaches a height of 17 ft. 2 in. (5.23 m) with ISO container. Serious injury or death to personnel could result from contact with electrical power lines. · Check ground conditions for firmness and extreme sideways inclination before picking up or off-loading a flatrack. Any ground instability beneath road wheels could cause serious injury or death to personnel. · Prior to and during any load or unload cycle, all personnel should stay clear of LHS and flatrack or serious injury or death to personnel could result. · Ensure rail transport locking pins are disengaged before unloading flatrack. Rail transport locking pins are used for rail transport only. Failure to comply may result in damage to equipment. NOTE LHS will only operate when transmission range selector is in N (Neutral). (6)   Move the joystick (10) to UNLOAD position until flatrack rollers (11) contact trailer. (7)   Release the joystick (10). (8)   Inspect and verify that trailer guides (12) are between flatrack main rails (13).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business