|
|
TM 9-2320-302-20-2
POWER TAKE-OFF (PTO) SOLENOID VALVE REPLACEMENT (M916A3, M917A2)
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Master battery switch in OFF position (TM 9-2320-
Tool kit, general mechanic's (Item 50, WP 0306 00)
302-10)
Materials/Parts
Air system drained (TM 9-2320-302-10)
Strap, tiedown (Item 33, WP 0305 00)
Transmission tunnel access cover removed (WP 0268
Tag, marker (Item 34, WP 0305 00)
REMOVAL
1.
Disconnect hose assembly (2).
NOTE
Tag air hoses prior to removal to aid in installation.
2.
Disconnect two air hoses (1).
1
2
1
3.
Remove two screws (3), washer (14), and washer (13) and disconnect ground wire (12).
4.
Disconnect air hoses (6) from PTO (5) and PTO solenoid valve (10).
5.
Remove two tiedown straps (4).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |