Click here to make tpub.com your Home Page

Page Title: POWER TAKE-OFF (PTO) SOLENOID VALVE REPLACEMENT (M916A3, M917A2)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
POWER TAKE-OFF (PTO) SOLENOID VALVE REPLACEMENT (M916A3, M917A2)
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Master battery switch in OFF position (TM 9-2320-
Tool kit, general mechanic's (Item 50, WP 0306 00)
302-10)
Materials/Parts
Air system drained (TM 9-2320-302-10)
Strap, tiedown (Item 33, WP 0305 00)
Transmission tunnel access cover removed (WP 0268
Tag, marker (Item 34, WP 0305 00)
REMOVAL
1.
Disconnect hose assembly (2).
NOTE
Tag air hoses prior to removal to aid in installation.
2.
Disconnect two air hoses (1).
1
2
1
3.
Remove two screws (3), washer (14), and washer (13) and disconnect ground wire (12).
4.
Disconnect air hoses (6) from PTO (5) and PTO solenoid valve (10).
5.
Remove two tiedown straps (4).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business