REAR TIE DOWN AND ROLLER REPLACEMENT (M916A3)
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
Two
Tool kit, general mechanic's (Item 50, WP 0306 00)
References
Materials/Parts
Nut, lock (P/N M45913/1-8CG5C) (2)
Equipment Condition
Mud flap assembly removed (TM 9-2320-302-10)
Nut, lock (P/N 23-00901-116) (6)
REMOVAL
1.
Remove two locknuts (9), washers (10), screws (11), washers (12), and left mud flap bracket (8). Discard locknuts.
2.
Remove nut (7) and screw (6).
WARNING
Roller weighs 200 lb (91 kg). Attach suitable hoist prior to removal to prevent possible injury to personnel.
3.
Using suitable hoist, support tail roller (2).
4.
Remove six locknuts (13), washers (14), bolts (15), washers (16), and left tie down bracket (1). Discard locknuts.
5.
Remove tail roller (2).
6.
Remove two lubrication fittings (4) from tail roller (2).
7.
Repeat steps 1 and 4 for right mud flap bracket (3) and right tie down bracket (5).
2
3
1
4
5
6
13,14,15,16
9,10,11,12
7
8
|