Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
REAR TIE DOWN AND ROLLER REPLACEMENT (M916A3) - CONTINUED
0238 00
INSTALLATION
1.
Install right tie down bracket (1), washers (14), bolts (15), washers (16), and six new locknuts (13).
2.
Install right mud flap bracket (3), two washers (10), bolts (11), washers (12), and two new locknuts (9).
WARNING
Roller weighs 200 lb (91 kg). Attach suitable hoist prior to installation to prevent possible injury to person-
nel.
3.
Using suitable hoist, support and install tail roller (2).
4.
Repeat steps 1 and 2 for left tie down bracket (5) and left mud flap bracket (8).
5.
Install screw (6) and new locknut (7).
6.
Install two lubrication fittings (4) in tail roller (2).
1
2
4
6
7
13,14,15,16
8
3
5
9,10,11,12
7.
Install mud flap assembly (TM 9-2320-302-10).
8.
Lubricate tail roller (WP 0023 00).
END OF WORK PACKAGE
0238 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business