|
|
TM 9-2320-302-20-2
REAR HUB, DRUM, WHEEL BEARINGS, AND SEAL REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation, Adjustment (End Play)
INITIAL SETUP
Materials/Parts
Tools and Special Tools
Gasket (P/N 2208x440)
Tool kit, general mechanic's (Item 50, WP 0306 00)
Seal, oil (P/N 1277701)
Handle, installer (Item 15, WP 0306 00)
Oil, lubricating (Item 28, WP 0305 00)
Indicator, dial (Item 19, WP 0306 00)
References
Installation tool, ABS tone ring (Item 20, WP 0306
TM 9-2320-302-10
Pan, drain (Item 29, WP 0306 00)
Equipment Condition
Socket, socket wrench (Item 40, WP 0306 00)
Rear brakes caged (TM 9-2320-302-10)
Wrench, torque, 15-75 lb-ft (Item 57, WP 0306 00)
Rear wheel removed (TM 9-2320-302-10)
Wrench, torque, 50-250 lb-ft (Item 58, WP 0306 00)
Rear anti-lock brake system (ABS) sensor removed
Wrench, torque, 0-600 lb-ft (Item 59, WP 0306 00)
(rear-rear axle only) (WP 0205 00)
NOTE
Rear-rear axle ABS tone ring replacement is covered in this work package.
REMOVAL
NOTE
Procedure is the same for both sides.
Procedure is the same for both rear axles except as noted.
1.
Remove brake drum (7) from hub (5).
5
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |