|
|
TM 9-2320-302-20-2
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanic's (Item 50, WP 0306 00)
Front air brake chamber removed (WP 0181 00)
Front hub, drum, seals and bearings removed (WP
Materials/Parts
O-ring (P/N 1205G761)
Front brakeshoes removed (WP 0174 00)
Slack adjuster and S-cam removed (WP 0180 00)
REMOVAL
1.
Remove four bolts (5) and brake chamber bracket (1) from front brake spider (3).
2.
Remove grease fitting (4) from brake chamber bracket (1).
3.
Remove O-ring (2) from front brake spider (3). Discard O-ring.
1
3
2
5
4
INSTALLATION
1.
Install new O-ring (2) to front brake spider (3).
2.
Install grease fitting (4) to brake chamber bracket (1).
3.
Install brake chamber bracket (1) to front brake spider (3) with four bolts (5).
4.
Install slack adjuster and S-cam (WP 0180 00).
5.
Install front brakeshoes (WP 0174 00).
6.
Install front hub, drum, seals and bearings (WP 0208 00).
7.
Install front air brake chamber (WP 0181 00).
END OF WORK PACKAGE
0176 00-1/(-2 Blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |