|
|
TM 9-2320-302-20-2
FRONT AIR BRAKE CHAMBER REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Unit
Pin, cotter (P/N 2257-C-1173)
Tools and Special Tools
Pin, cotter (P/N 2257-D-1174)
Tool kit, general mechanic's (Item 102, WP 0333 00)
Equipment Condition
Materials/Parts
Air system drained (TM 9-2320-303-10).
Compound, sealing, pipe (Item 17, WP 0332 00)
Strap, tiedown (Item 41, WP 0332 00)
Hood opened (TM 9-2320-303-10).
NOTE
Each of two front air brake chambers is replaced the same way. Left-front air brake chamber is shown.
REMOVAL
WARNING
DO NOT disconnect any air system lines or fittings unless vehicle engine is shut off and air system pressure
is relieved. Failure to follow this warning could result in serious injury to personnel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |