Click here to make tpub.com your Home Page

Page Title: ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
PAVEMENT BREAKER REPAIR (CONT)
NOTE
A p p l y coat of lubricating oil to
packings prior to assembly.
1.
INSTALL plug (1), spring (2), valve SPOOL
( 3 ) , new packing (4), new packing (5),
bushing (6), wiper (7), and washer (8).
2.
PRESS DOWN assembly from step 1 and
INSTALL two PINS (9).
INSTALL LEVER (10) and pin (11).
3.
4.
INSTALL new packing (12) and charging
VALVE (13) in accumulator chamber (14).
5.
APPLY light COAT of LUBRICATING OIL on
accumulator CHAMBER (14) and INSTALL
accumulator diaphragm VALVE (15) over
accumulator chamber (14) from charging valve
(13) end.
CAUTION
If press is necessary to complete
step 6, do not use powered
p r e s s and use short strokes to
prevent equipment damage.
6.
APPLY light COAT of GAA to OUTSIDE of
accumulator diaphragm valve (15) and INSIDE
o f accumulator cylinder (16). INSTALL
ASSEMBLY from STEP 5 in accumulator
cylinder (16) from chamfered end of
accumulator cylinder (16).
7.
TEST charge ACCUMULATOR assembly (17)
from STEP-6 as follows:
a . Place accumulator assembly (17) in
soft-jawed vise.
b. Loosen valve (18) 1-1/2 turns.
c . Charge accumulator assembly (17)
with nitrogen to 600 psi (41 bar).
d. Check for leaks.
21-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business