Click here to make tpub.com your Home Page

Page Title: Section VII. BACKHOE SWING CYLINDER RELIEF VALVE REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE SWING CYLINDER RELIEF VALVE REPAIR
Section VII.
BACKHOE SWING CYLINDER RELIEF VALVE REPAIR
This task covers:
a. Disassembly b. Assembly
Materials/Parts (Cont):
Applicable configuration:
Packing
SEE
Packing
Tools and Special Equipment:
Oil, Lubricating
Shop Equipment, SC 4910-95-CL-A31
TOOl Kit, SC 5180-90-CL-N26
Equipment Condition:
Materials/Parts:
Reference
Condition Description
Packing
Backhoe Swing Cylinder
Packing
Relief Valve Removed
Packing
NOTE
Procedure is the same for both swing cylinder relief valves.
1.
REMOVE two PACKINGS (1) and backup ring (2). DISCARD PACKINGS.
2.
REMOVE PLUG (3) and packing (4). DISCARD PACKING.
3.
IF PRESENT, REMOVE DISC(S) (5) and SHIM(S) (6).
4.
REMOVE spring HOLDER (7), two packings (8), and spring (9). DISCARD PACKINGS.
5.
REMOVE two valve SEATS (10 and 11) from valve body (12).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business