Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
BACKHOE CONTROL VALVE, BOOM SECTION VALVE REPAIR (CONT)
CAUTION
Check
tags to be sure correct
relief
valve is installed in
correct
place, otherwise valve
section
will not work properly.
19. INSTALL six new packings (40, 41, 42, 43,
44, and 45), safety relief VALVE (46), and
pressure relief valve (47). TIGHTEN to 65-85
Ib-ft (85-115 N.m).
INSTALL SPRING (48) in disc (49) by turning
20.
spring (48).
INSTALL spring (48) and DISC (49) in valve
21.
body (12).
INSTALL new packing (50) and PLUG (51).
22.
REPEAT STEPS 20 thru 22 for plug (52).
23.
NOTE
Follow-on Maintenance:
Install boom section valve in
backhoe control valve (page
20-68

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business