|
|
TM
5-2420-224-34
BACKHOE CONTROL VALVE, BOOM SECTION VALVE REPAIR (CONT)
13. INSTALL washer (25) and SETSCREW (26).
TIGHTEN SETSCREW number of turns noted
during Disassembly.
14. HOLD SETSCREW (26) and TIGHTEN NUT
(27) to 50-80 lb-in. (5.6-9.0 N.m).
15. INSTALL new packing (28), POPPET (29),
Spring (30), spring (31), new packing (32),
piston (33), and retainer (34) in valve body
(35).
16. INSTALL retaining RING (36) in valve body
(35).
17. INSTALL washer (37) and SETSCREW (38).
TIGHTEN SETSCREW (38) number of turns
noted during Disassembly.
18. HOLD SETSCREW (38) and TIGHTEN NUT
(39) to 50-80 lb-in. (5.6-9.0 N.m).
20-67
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |