Click here to make tpub.com your Home Page

Page Title: Front Loader/Forklift Control Valve Body Section Assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
Front Loader/Forklift Control Valve Body Section Assembly
NOTE
Apply coat of lubricating oil to packings prior to assembly.
1.
INSTALL new PACKING (1) in valve body (2).
2.
INSTALL SPOOL (3) in valve body (2).
INSTALL PISTON (4), spring (5), new packing (6), and plug (7) in bottom of valve body (2).
3.
4.
INSTALL spring HOLDER (8) and two screws (9).
5.
INSTALL BALL (10) and spring (11).
HOLD jam NUT (12) and INSTALLSCREW (13) number of turns noted.
6.
7.
HOLD SCREW (13) and TIGHTEN jam NUT (12).
20-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business