|
|
TM 5-2420-224-34
FRONT LOADER/FORKLIFT CONTROL VALVE REPAIR (CONT)
Front Loader/Forklift Control Valve Body Section Disassembly
1.
HOLD SCREW (1) and LOOSEN jam NUT (2).
NOTE
Note number of turns necessary to remove screw.
2.
HOLD jam NUT (2) and REMOVE SCREW (1).
3.
REMOVE spring (3) and BALL (4).
4.
REMOVE two screws (5) and spring HOLDER (6).
5.
TURN valve BODY (7) OVER and REMOVE plug (8), packing (9), spring (10), and PISTON (11).
DISCARD PACKING.
6.
REMOVE SPOOL (12) from valve body (7).
7.
REMOVE and DISCARD PACKING (13) from valve body (7).
20-21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |