|
|
TM 5-2420-224-34
PISTONS, RINGS, CONNECTING RODS, AND BEARINGS REPLACEMENT
(CONT)
NOTE
Perform steps 1 thru 3 only if
installing new bushing.
1.
U S I N G suitable PRESS, INSTALL new
BUSHING (1) in upper connecting rod (2).
2.
USING upper connecting ROD (2) as a guide,
DRILL a 0.12-in. (3-mm) oil HOLE through
bushing (1).
REAM inside diameter of BUSHING (1) to
3.
1.419-1.420 in. (36.030-36.040 mm).
4.
IF cylinder BORE in crankcase (3) has been
BORED OUT,
SELECT appropriate
replacement PISTON from following table.
I N S T A L L PISTON (4), pin (5), and two
5.
retaining rings (6) on `upper connecting rod
(2).
Replacement Pistons
Piston Diameter
Cylinder Bore
Total Height, Crankcase
Repair Stage
(mm)
In.
(mm)
In.
In.
(mm)
13-34
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |