Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
CRANKSHAFT, MAIN BEARINGS, AND REAR SEALS REPLACEMENT
(CONT)
NOTE
Perform step 12 only with engine
serial numbers under 941675.
INSTALL 6 COUNTERWEIGHTS (23) and 12
12.
bolts (24). TIGHTEN BOLTS for counterweight
m a r k e d 11 to 59-66 Ib-ft (80-90 N.m).
TIGHTEN REMAINING BOLTS to 22 +7 Ib-ft
(30 +10 N.m). TIGHTEN a SECOND TIME
90 +20 degrees.
INSTALL COVER (25) and bearing (26).
13.
NOTE
Follow-on Maintenance:
I n s t a l l flywheel end bell (page
Install flywheel (page 13-25).
Install oil pump (page 13-60).
Install timing gear cover, gears,
and case (page 3-56).
Install fuel injector nozzles (page
Install engine (page 3-2).
13-23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business