Click here to make tpub.com your Home Page

Page Title: TIMING GEAR COVER, GEARS, AND CASE REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
TIMING GEAR COVER, GEARS, AND CASE REPLACEMENT
This task covers:
a. Removal
b. Inspection
c. Installation
INITIAL SETUP
References:
Tools and Special Equipment:
TM 5-2420-224-20
Shop Equipment, SC 4910-95-CL-A31
Tool Kit, SC 5180-90-CL-N26
Equipment Condition:
Installing Tool, P/N 352 589 07 15 00
Reference
Condition Description
Puller, P/N 355 589 00 33 00
TM 5-2420-224-20
Fan Impeller Removed
Materials/Parts:
TM 5-2420-224-20
Counter Engine
Gasket
Revolution (Hourmeter)
Seal
Removed
Key
TM 5-2420-224-20
Fan Belt Removed
Gasket
Fuel Injection Pump
Removed
REMOVAL
NOTE
Prior to performing step 1, place
transmission shift lever in first gear
position.
1.
REMOVE bolt (1), PULLEY (2), and bearing
SLEEVE (3) from crankshaft (4).
2.
USING PULLER, REMOVE vibration DAMPER
(5).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business