|
|
TM 5-2420-224-34
CRANES, SHOVELS, AND EARTHMOVING EQUIPMENT MAINTENANCE
This chapter illustrates and describes procedures for maintenance of the cranes, shovels, and
earthmoving equipment. A list of tasks contained in this chapter is shown below.
Page
Backhoe Main Frame Replacement and Repair . . . . . . . . . . . . . . . . . . . . . . . .
Crane Mast Replacement and Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Inner Boom Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Outer Boom Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Extension Boom Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Gear Bearing Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Intermediate Gear Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Drive Gear and Bushings Replacement . . . . . . . . . . . . . . . . . . . . . . . .
Crane Pinion Gear Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Crane Pinion Gear Bushings Replacement . . . . . . . . . . . . . . . . . . . . . . . . . .
BACKHOE MAIN FRAME REPLACEMENT AND REPAIR
This task covers:
a. Removal b. Inspection c. Repair d. Installation
References:
Applicable Configuration:
TM 5-2420-224-20
SEE
TM 9-237
Tools and Special Equipment:
Equipment Condition:
Shop Equipment, SC 4910-95-CL-A31
Tool Kit, SC 5180-90-CL-N26
Condition Description
Reference
Shop Equipment, Welding, SC 4940-95-CL-B19
Backhoe Stabilizers
TM 5-2420-224-20
Removed
Materials/Parts:
Backhoe Swing Cylinders
TM 5-2420-224-20
Nut, Lock
Removed
Personnel Required: (3)
Backhoe Control Tower
TM 5-2420-224-20
Removed
Pintle Assembly Removed
TM 5-2420-224-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |