|
|
TM
5-2420-224-34
FORKLIFT CARRIAGE CHAIN REPLACEMENT
This task covers:
a. Removal b. Inspection c. Installation
Applicable Configuration
Materials/Parts:
Pin, Cotter (6)
HMMH
Nut, Lock (2)
Tools and Special Equipment:
Equipment Condition:
Shop Equipment, SC 4910-95-CL-A31
TooI Kit, SC 5180-90-CL-N26
Reference
Condition Description
Forklift Carriage Assembly
Removed
NOTE
Procedure is the same for both
carriage chains.
1.
REMOVE two cotter pins (1) and PIN (2) and
DISCONNECT carriage CHAIN (3). DISCARD
cotter PINS.
2.
REMOVE cotter pin (4), lock nut (5), and
chain ANCHOR (6). DISCARD rotter PIN and
lock NUT.
If either carriage chain must be replaced, replace
both chains.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |