Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
FRONT
LOADER/FORKLIFT
CONTROL
VALVE
AND
BRACKET
REPLACEMENT
AND
ADJUSTMENT
(CONT)
INSTALLATION
1.
INSTALL control VALVE (1), three bolts (2),
and three nuts (3) on bracket (4).
2.
lNSTALL lubrication FITTING.
3.
INSTALL LEVER (6), two pins (7), and two
new cotter pins (8).
4.
INSTALL two CLAMPS (9). DO NOT
TIGHTEN SCREWS (10).
5.
INSTALL BRACKET (4), four screws (11 ), and
four new lock nuts (12).
11-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business