Click here to make tpub.com your Home Page

Page Title: CRANE VALVE BANK RELIEF VALVE REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
5-2420-224-34
CRANE
VALVE
BANK
RELIEF
VALVE
REPLACEMENT
This task covers:
a. Removal b. Installation
INITIAL
SETUP
Applicable Configuration:
General Safety Instructions:
HMMH
WARNING
Tools and Special Equipment:
High pressure hydraulics [oil
Shop Equipment, SC 4910-95-CL-A31
under 2450 psi (16,893 kPa)]
TOOl Kit, SC 5180-90-CL-N26
operate  this  equipment.
Never  disconnect  any
Materials/Parts:
hydraulic  line  or  fitting
Packing
without  first  dropping
pressure to zero. A high
Packing
pressure  oil  stream  can
pierce  body  and  cause
Packing
s e v e r e injury to personnel.
Rags
Fuel and oil are slippery and
References:
can cause falls. To avoid
injury, wipe up spilled fuel or
TM 5-2420-224-20
oil with rags.
Equipment Condition:
Reference
Condition Description
Hydraulic Pressure
TM 5-2420-224-20
Relieved
NOTE
Have large capacity container available to catch hydraulic fluid.
1.
REMOVE crane valve bank relief VALVE (1) from crane valve bank (2).
2.
REMOVE three PACKINGS (3, 4, and 5) from crane valve bank relief valve (1). DISCARD PACKINGS.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business