Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
RIGHT PLATFORM REPLACEMENT (CONT)
INSTALLATION
WARNNG
A d h e s i v e causes immediate bonding on contact with eyes, skin, or clothing and
also  gives  off  harmful  vapors. Wear  protective  goggles  and  use  in
well-ventilated area. If adhesive gets in eyes, try to keep eyes open; flush eyes
w i t h water for 15 minutes and get immediate medical attention.
1.
APPLY COAT of SEALING COMPOUND to six SCREWS (1). USING suitable HOIST, INSTALL right
PLATFORM (2), six screws (1), six washers (3), and four new lock nuts (4). TIGHTEN SCREWS to
220 Ib-ft (298 N.m).
2.
INSTALL wiring HARNESS (5) in right platform (2).
INSTALL BOX (6) and four screws (7).
3.
NOTE
Follow-on  Maintenance:
right rear composite stoplight/taiIlight (TM 5-2420-224-20).
Install
work light (TM 5-2420-224-20).
Install
hydraulic accessory box (TM 5-2420-224-20).
Install
rear hydraulic tank (TM 5-2420-224-20).
Install
8-15/(8-16
Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business