|
|
TM 5-2420-224-34
RIGHT PLATFORM REPLACEMENT (CONT)
INSTALLATION
WARNNG
A d h e s i v e causes immediate bonding on contact with eyes, skin, or clothing and
also gives off harmful vapors. Wear protective goggles and use in
well-ventilated area. If adhesive gets in eyes, try to keep eyes open; flush eyes
w i t h water for 15 minutes and get immediate medical attention.
1.
APPLY COAT of SEALING COMPOUND to six SCREWS (1). USING suitable HOIST, INSTALL right
PLATFORM (2), six screws (1), six washers (3), and four new lock nuts (4). TIGHTEN SCREWS to
220 Ib-ft (298 N.m).
2.
INSTALL wiring HARNESS (5) in right platform (2).
INSTALL BOX (6) and four screws (7).
3.
NOTE
Follow-on Maintenance:
right rear composite stoplight/taiIlight (TM 5-2420-224-20).
Install
work light (TM 5-2420-224-20).
Install
hydraulic accessory box (TM 5-2420-224-20).
Install
rear hydraulic tank (TM 5-2420-224-20).
Install
8-15/(8-16
Blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |