|
|
TM 5-2420-224-34
RIGHT PLATFORM REPLACEMENT (CONT)
2.
REMOVE wiring HARNESS (3) from right platform (4).
3.
USING suitable HOIST, REMOVE six screws (5), six washers (6), four lock nuts (7), and right
PLATFORM (4). DISCARD lock NUTS.
1.
Inspect for corrosion and damage.
2.
Check mounting holes to chassis for elongation.
3.
Inspect non-slip surfaces for traction.
8-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |