Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
LEFT PLATFORM REPLACEMENT (CONT)
INSTALL BOX (6) and four screws (7).
3.
4.
INSTALL BRACKET (8), screw (9), and nut
(10).
INSTALL BRACKET (11), two bolts (12), and
5.
two new lock nuts (13).
NOTE
Follow-on Maintenance:
Install backup alarm (TM 5-2420-
224-20).
Install  left  rear  composite
stoplight/taillight (TM 5-2420-224-
20).
Install work light (TM 5-2420-224-
20).
Install hydraulic oil cooler (TM 5-
2420-224-20).
Install hose reel assembly (TM 5-
2420-224-20).
Install front hydraulic tank (TM 5-
2420-224-20).
Install tilt and latch control valve
8-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business