|
|
TM 5-2420-224-34
LEFT PLATFORM REPLACEMENT (CONT)
INSPECTION
1.
Inspect for corrosion and damage.
2.
Check mounting holes to chassis for
elongation.
Inspect non-slip surfaces for traction.
3.
INSTATLLATION
WARNING
Adhesive causes immediate
bonding on contact with eyes,
skin, or clothing and also gives
off harmful vapors. Wear
p r o t e c t i v e goggles and use in
w e l l - v e n t i l a t e d area. If adhesive
g e t s in eyes, try to keep eyes
o p e n ; flush eyes with water for
1 5 minutes and get immediate
m e d i c a l attention.
1.
APPLY COAT of SEALING COMPOUND to
six SCREWS (1). USING suitable HOIST,
INSTALL left PLATFORM (2), six screws (1),
six washers (3), and four new lock nuts (4).
TIGHTEN SCREWS to 220 Ib-ft (298 N.m).
2.
CONNECT wiring HARNESS (5).
8-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |