Click here to make tpub.com your Home Page

Page Title: INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
LEFT PLATFORM REPLACEMENT (CONT)
INSPECTION
1.
Inspect for corrosion and damage.
2.
Check mounting holes to chassis for
elongation.
Inspect non-slip surfaces for traction.
3.
INSTATLLATION
WARNING
Adhesive causes immediate
bonding on contact with eyes,
skin, or clothing and also gives
off  harmful  vapors.  Wear
p r o t e c t i v e goggles and use in
w e l l - v e n t i l a t e d area. If adhesive
g e t s in eyes, try to keep eyes
o p e n ; flush eyes with water for
1 5 minutes and get immediate
m e d i c a l attention.
1.
APPLY COAT of SEALING COMPOUND to
six SCREWS (1). USING suitable HOIST,
INSTALL left PLATFORM (2), six screws (1),
six washers (3), and four new lock nuts (4).
TIGHTEN SCREWS to 220 Ib-ft (298 N.m).
2.
CONNECT wiring HARNESS (5).
8-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business