Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
REAR FRAME SECTION AND SUBFRAME REPLACEMENT (CONT)
INSTALL BUSHING (12) in subframe (5).
6.
7.
APPLY COAT of SEALING COMPOUND to
BOLT (13) and INSTALL BOLT (13) and nut
( 1 4 ) in subframe (5). TIGHTEN NUT to
600 lb-ft (814 N.m).
8.
INSTALL BRACKET (15), bolt (16), and new
lock nut (17).
NOTE
Follow-on Maintenance:
Install right platform (SEE) (page
Install left platform (SEE) (page
Install fuel tank (TM 5-2420-
224-20).
Install air pressure tanks (TM 5-
2420-224-20).
Install backhoe latch cylinder
(SEE) or crane latch cylinder
(HMMH) (TM 5-2420-224-20).
Install crane travel lock (HMMH)
(TM 5-2420-224-20).
I n s t a l l backhoe subframe deck
(SEE) (TM 5-2420-224-20).
Install chassis tool box/deck plate
(TM 5-2420-224-20).
Install backhoe assembly (SEE) or
crane (HMMH) (TM5-2420-224-20).
8-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business