Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-34
TRANSMISSION REPLACEMENT (CONT)
20. INSTALL three new packings (43, 44, and
45) and fluid passage BOLT (46) and
CONNECT two HOSES (47 and 48).
21. POSITION STE/ICE-R wiring HARNESS (49)
in place.
22. INSTALL new tiedown STRAPS (50 and 51).
23. POSITION BRACKET (52) and INSTALL
SCREW (53).
NOTE
Follow-on Maintenance:
Fill transmission with oil (LO 5-
2420-224-12).
Install transmission shift controls
Install floor platform (TM 5-2420-
224-20).
Install engine (page 3-2).
Install rear axle (steps 3 and 13
thru 20, Page 6-1).
Install front axle (steps 6 thru 35,
Bleed brake system (TM 5-2420-
224-20).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business