|
|
TM 5-2420-224-34
3. O-Ring (Preformed Packing) Boss. The boss connection has a straight thread. The seal for this
connection has a preformed packing that fits on top of the thread. This packing is squeezed
into the extra space at the top of the female thread and seals the connection.
4. Flareless. This fitting has a straight thread. The female fitting contains a ferrule that mates with
a cavity in the male fitting. Use care not to overtighten to avoid damage to the ferrule.
5. Installation of Preformed Packings.
a. Before installing a new packing, inspect threads and packing seat for nicks, cracks, and
distortion.
b. Make sure the packing is correct type and size. If not sure, check Repair Parts and
Special Tools List (TM5-2420-224-24P).
c. Before installing a new packing, apply coat of lubricating oil to packing (Appendix B,
Item 30).
d. When installing a packing, always protect it from cuts or nicks. Do not install packing
directly over threads. If available, install packing over a plastic or rubber thread guard
supplied with new fittings. if no thread guard is available, protect packing by wrapping
fitting threads with heavy, smooth, lint-free paper or tape.
e. If a backup washer is used with the packing, it must be free of cuts, nicks, and
distortion. An unserviceable backup washer can cause packing to distort or rupture when
hydraulic pressure is applied, resulting in a leak.
f. Always make sure packing is not damaged, twisted, or distorted after installation.
6. Installation of Adjustable Fittings.
a. Apply coat of lubricating oil (Appendix B, Item 30) to new packing.
2-41
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |