|
|
TM
5-2420-224-20-1
Table 3-5. Troubleshooting (Cont)
Malfunction
Test or Inspection
Corrective Action
ELECTRICAL SYSTEM (CONT)
Step 36. Check for +24 VDC between wire 2 and wire 9 (45) and ground at cab
floor separation point (25).
If +24 VDC is not present, repair wiring 2 and wiring 9
between NATO slave receptacle and cab floor separation point.
If +24 VDC is present, repair wiring 2 and wiring 9 between
cab floor separation point and connector AA.
Step 37. Check for +24 VDC between wire 286 (6) and ground at relay K2 (47).
If +24 VDC is not present, perform Malfunction 2.
If +24 VDC is present, repair wiring 286 between D+ relay and
relay K2.
3-230
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |