| |
TM 5-2420-222-20-3
PRESSURE CONTROL VALVE-TO-LOADER CONTROL VALVE OIL LINE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
21.
Tee(9)
Hose(10)
a. Uncap.
b.
Take off tag.
c.
Screw in and tighten using 7/8-inch and
1-inch open-end wrenches.
22.
Loader backhoe
Transmission oil
Install (page 2-836).
filter
23.
Transmission
Check fluid level and add proper amount
and grade (TM 5-2420-222-10).
24.
Engine
Start and run at high idle
(TM 5-2420-222-10).
2-1651
|