| |
TM 5-2420-222-20-3
PRESSURE CONTROL VALVE-TO-LOADER CONTROL VALVE OIL LINE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT
NOTE
For more information on how to inspect parts, go to General Maintenance Instructions
(page 2-137).
Replace defective parts as needed.
11.
All metal parts
Look for cracks, breaks, and abnormal
bends.
12.
All threaded parts
Look for damaged threads.
INSTALLATION
13.
Special
New packing (2)
Place in position.
connector (1)
14.
Loader control
Special connector
a.
Unplug valve (3).
valve (3)
(1) with assembled
b.
Screw in and tighten using 1 1/4-inch
packing (2)
open-end wrench.
15.
Elbow (4)
Nut (5)
Screw on all the way.
16.
New packing (6)
Place in position.
17.
Pressure control
Elbow (4) with
a.
Unplug valve (7).
valve (7)
assembled parts
b.
Screw into same relative position as
noted during removal using 1 1/16-inch
open-end wrench.
18.
Pressure control
Nut (5)
Using 1 1/16-inch and 1 1/4-inch open-end
valve (7) and
wrenches, tighten until seated against
elbow (4)
valve (7).
19.
Elbow (4)
Line (8)
a.
Take off tag.
b.
Screw on and tighten using 1-inch and
1 1/4-inch open-end wrenches.
20.
Special
Line (8)
a.
Take off tag.
connector (1)
b.
Screw on and tighten using 1-inch and
1 1/4-inch open-end wrenches.
2-1650
|