Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED ACTION LOCATION ITEM REMARKS 63. Connector link (13), Two nuts Using two 3/4-inch open-end wrenches, turnbuckle (14), (15 and 16) loosen. and bucket control rod (7) 64. Connector link (13) Turnbuckle (14) a. If handle (11) is tilted to right, and bucket control using 3/4-inch open-end wrench, turn rod (7) to lengthen assembly. b. If handle (11) is tilted to left, using 3/4-inch open-end wrench, turn to shorten assembly. 65. Connector link (13), Two nuts a. Using two 3/4-inch open-end turnbuckle (14), (15 and 16) wrenches, tighten until seated against and bucket control turnbuckle (14). rod (7) b. Repeat steps 62 thru 65. 2-1335

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business