| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
55. Loader control box
Control pivot (3)
Place in position.
(1) and two
with assembled parts
spool devises (2)
56. Loader control box
Two screws (4) and
Screw in and tighten using 9/16-inch
(1) and control
new lockwashers (5)
box wrench.
pivot (3)
57. Boom control rod
Two connector
Place in position.
(6), bucket control
pins (8)
rod (7), and two
spool devise (2)
58. Two spool devises
Two new cotter
a.
Place in position.
(2) and two
pins (9)
b.
Using slip-joint pliers, bend ends
connector pins (8) back.
59. Handle mount (10)
Handle (11) with
Screw in and tighten to position noted
assembled parts
during removal.
60. Handle mount (10)
Nut (12)
Using 15/16-inch open-end wrench,
and handle (11)
tighten until seated against handle mount (10).
61.
Right platform
Install (page 2-1079).
ADJUSTMENT
62. Handle mount (10)
Handle (11)
Check for proper position.
Handle must be in vertical position.
NOTE
If handle is in vertical position, skip steps 63 thru 68.
If handle is not tilted to left or right, skip steps 63 thru 65.
CAUTION
Upper nut is right-hand thread. Lower nut is left-hand thread. Overtightening nuts
may cause damage to parts.
2-1334
|