| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ADJUSTMENT - CONTINUED
NOTE
If handle is not tilted to front or rear, skip steps 66 thru 68.
CAUTION
Upper nut is right-hand thread. Lower nut is left-hand thread. Overtightening nuts
may cause damage to parts.
66. Connector link (1),
Two nuts
Using two 3/4-Inch open-end wrenches,
turnbuckle (2),
(4 and 5)
loosen.
and boom control
rod (3)
67. Connector link (1)
Turnbuckle (2)
a.
If handle (6) is tilted to front,
and boom control
using 3/4-inch open-end wrench, turn
rod (3)
to lengthen assembly.
b.
If handle (6) is tilted to rear,
using 3/4-inch open-end wrench, turn
to shorten assembly.
68. Connector link (1),
Two nuts
a.
Using two 3/4-inch open-end
turnbuckle (2),
(4 and 5)
wrenches, tighten until seated against
and boom control
turnbuckle (2).
rod (3)
b.
Repeat steps 62 thru 68.
2-1336
|