| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
49. Pivot block (5)
Spring pin (9)
a.
Using 1/4-inch straight drive-pin
and universal
punch and 1-pound head ball-peen
block (8)
hammer, tap in.
b.
Take pivot block (5) out of
machinists vise.
50. Handle mount (1)
Pivot blocked (4)
a.
Coat with grease.
with assembled parts
b.
Place in position.
51. Handle mount (1)
Pivot pin (10)
Place in position.
and pivot block (4)
52. Handle mount (1)
New cotter pin (11)
a.
Place in position.
and pivot pin (10)
b.
Using slip-joint pliers, bend
ends back.
53. Handle (12)
Handle grip (13)
Twist on.
54.
Nut (14)
Screw on all the way.
2-1333
|