TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY - CONTINUED
41.
Handle mount (1)
Universal block (2)
a.
Place handle mount (1) in
machinists vise.
b.
Place in position.
42.
Handle mount (1)
Spring pin (3)
a.
Using 1/4-inch straight drive-pin
and universal
punch and 1-pound head ball-peen
block (2)
hammer, tap in.
b.
Take handle mount (1) out of
machinists vise.
43.
Pivot block (4)
Control pivot (5)
a.
Coat with grease.
and washers (6),
b.
Place pivot block (4) in machinists
if present vise.
c.
Using same quantity of washers (6) in
same position as noted during
assembly, place in position.
44.
Control pivot (5),
Pivot shaft (7)
Using 1/2-inch straight drive-pin punch
pivot block (4),
and 1-pound head ball-peen hammer, tap
and washers (6),
in.
if present
45.
Control pivot (5)
Pivot block (4)
Using thickness gage, measure end play.
End play must be 0.040-inch (1 mm) or less.
NOTE
If end play measured in step 45 is correct, skip steps 46 and 47.
46.
Control pivot (5),
Pivot shaft (7)
Using 1/2-inch straight drive-pin punch
pivot block (4),
and 1-pound head ball-peen hammer, drive
and washers (6),
out.
if present
47.
Control pivot (5)
Washers (6)
a.
Add enough to get proper end play.
and pivot block (4)
Each washer is 0.036-inch (0.91 mm) thick.
b.
Repeat steps 44 thru 47.
48.
Pivot block (4)
Universal block (8)
Place in position.
with assembled parts
2-1332
|