| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
38.
Turnbuckle (4) and
Nut (6)
a.
Using 3/4-inch open-end wrench,
control link (5)
tighten until seated against
turnbuckle (4).
b.
Take turnbuckle (4) out of machinists
vise.
39.
Connector link (5)
Universal block (7)
a.
Place connector link (5) in
machinists vise.
b.
Coat with grease.
c.
Place in position.
40.
Connector link (5)
Spring pin (8)
a.
Using 1/4-inch straight drive-pin
and universal
punch and 1-pound head ball-peen
block (7)
hammer, tap in.
b.
Take connector link (5) out of
machinists vise.
c.
Repeat steps 33 thru 40 for boom
control rod.
2-1331
|