| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
18.
Handle mount (4)
Universal block (13)
a.
Take off.
with assembled parts
b.
Take handle mount (4) out of
machinists vise.
NOTE
Boom control rod and bucket control rod are disassembled the same way. Bucket
control rod is shown. Repeat steps 19 thru 26 for boom control rod.
19.
Connector link (15)
Spring pin (16)
a.
Place connector link (15) in
universal block (11)
machinists vise.
b.
Using 1/4-inch straight drive-pin punch
and 1-pound head ball-peen hammer,
tap out.
2-1327
|