| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
DISASSEMBLY
8.
Handle (1)
Nut (2)
Unscrew and take off.
9.
Handle grip (3)
Twist off.
10.
Handle mount (4)
Cotter pin (6)
a.
Using slip-joint pliers, straighten
and pivot pin (5)
ends and take out.
b.
Get rid of.
11.
Handle mount (4)
Pivot pin (5)
Take out.
and pivot block (7)
12.
Handle mount (4)
Pivot block (7)
Take off.
with assembled parts
NOTE
Pivot block end play is determined by amount of washers between pivot block and
control block. There may be no washers, one washer, or several washers between
pivot block and control block.
13.
Pivot block (7),
Pivot shaft (10)
a.
Place pivot block (7) in machinists
control pivot (8),
vise.
and washers (9),
b.
Using 1-pound head ball-peen hammer
if present
and 1/2-inch straight drive-pin punch,
drive out.
14.
Pivot block (7)
Control pivot (8)
a.
If present, note quantity and relative
and washers (9),
position of washers (9) for proper
if present
placement during assembly.
b.
Take off.
15.
Pivot block (7) and
Spring pin (12)
Using 1/4-inch straight drive-pin punch
universal block (11)
and 1-pound head ball-peen hammer, tap
out.
16.
Pivot block (7)
Universal block (11)
a.
Take off.
with assembled parts
b.
Take pivot block (7) out of machinists
vise.
17.
Handle mount (4) and
Spring pin (14)
a.
Place handle mount (4) in machinists
universal block (13)
vise.
b.
Using 1/4-inch straight drive-pin punch
and 1-pound head ball-peen hammer,
tap out.
2-1326
|