| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE HANDLE AND LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
DISASSEMBLY - CONTINUED
20.
Connector link (1)
Universal block (2)
Take off.
CAUTION
Connector links and upper nuts are right-hand thread. Boom and bucket control
rods and lower nuts are left-hand thread. Turn buckles are right-hand thread on
one end and left-hand thread on the other end. Turning parts in the wrong
direction or mixing up parts will cause damage to threads.
21.
Connector link (1)
Nut (4)
a.
Using two 3/4-inch open-end
and turnbuckle (3)
wrenches, loosen.
b.
Take connector link (1) out of
machinists vise.
22.
Turnbuckle (3)
Connector link (1)
a.
Place turnbuckle (3) in machinists
with assembled
vise.
nut (4)
b.
Note number of exposed threads and
relative position for proper placement
during assembly.
c.
Unscrew and take out.
23.
Connector link (1)
Nut (4)
Unscrew and take off.
24.
Turnbuckle (3) and
Nut (6)
Using 3/4-inch open-end wrench, loosen.
bucket control
rod (5)
25.
Turnbuckle (3)
Bucket control rod
a.
Note number of exposed threads for
5) with assembled
proper placement during assembly.
nut (6)
b.
Unscrew and take out.
c.
Take turnbuckle (3) out of machinists
vise.
26.
Bucket control
Nut (6)
a.
Unscrew and take off.
rod (5)
b.
Repeat steps 19 thru 26 for boom
control rod.
CLEANING
NOTE
For more information on how to clean parts, go to General Maintenance
Instructions (page 2-137).
2-1328
|